powered by Surfing Waves

    Labels

    Affiliate (1) Amazon Store (3) Borneo Post Online Borneo (13273) Free (1) Free Money (2) Healthy (1) How to (1) IFTTT (14280) Lowyat.NET Lowyatt (1003) Money (1) Utama (1341) YouTube (22)

    As an Amazon Associate I earn from qualifying purchases.

    Monetize - Make Money Online is a participant in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for sites to earn advertising fees by advertising and linking to affiliate-program.amazon.com

    Search

    Friday, July 24, 2020

    SMC: Works to improve drainage flow along Jalan Poh Yew to commence immediately

    (From second left) Tiong, Ting and Lau inspecting the drainage flow of Jalan Poh Yew.

    SIBU: Works to improve the drainage flow along Jalan Poh Yew of Taman Li Hua will commence with immediate effect, said Sibu Municipal Council (SMC) chairman Clarence Ting.

    He said the drainage improvement works for Jalan Poh Yew, barring unforeseen circumstances, should be completed before the end of the year.

    “We need to upgrade the drainage system so that the outflow of the river from Jalan Poh Yew into the nearby Sungei Rajang will not encounter any obstacles and will be smooth,” he said.

    Ting was speaking to reporters after inspecting the drainage flow of Taman Li Hua this morning.

    Accompanying him were Taman Li Hua Neighborhood Committee chairman Peter Lau, advisor Penghulu Tiong Tung Loo and councilor Jenny TIng。

    Ting said he had already instructed Ting to take note of the issue and to get works start immediately.

    He said it was shocking when he saw the poor drainage flow of Jalan Poh Yew, with at least three spots blocked due to the sinking land.

    “Priority will be given to improve these three spots and once upgrading works is completed, I believe the river outflow will be better,” he added.

    Meanwhile, he also told Lau to come up with a thorough plan on the drainage system in Taman Li Hua that needed to be upgraded.

    He also took note of the poor drainage flow in several areas in Jalan Maludan and Lane 6, Jalan Poh Yew which required urgent remedies.

    The post SMC: Works to improve drainage flow along Jalan Poh Yew to commence immediately appeared first on Borneo Post Online.



    from Borneo Post Online https://ift.tt/2ZYObAh
    via IFTTT

    No comments:

    Post a Comment