powered by Surfing Waves

    Labels

    Affiliate (1) Amazon Store (3) Borneo Post Online Borneo (13273) Free (1) Free Money (2) Healthy (1) How to (1) IFTTT (14280) Lowyat.NET Lowyatt (1003) Money (1) Utama (1341) YouTube (22)

    As an Amazon Associate I earn from qualifying purchases.

    Monetize - Make Money Online is a participant in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for sites to earn advertising fees by advertising and linking to affiliate-program.amazon.com

    Search

    Saturday, March 27, 2021

    CM: Kampung Sambir village extension scheme worth RM52.1 mln to be implemented until June 2023

    Abang Johari (left), (from third left to right) Abdul Karim, Nancy, Julaihi, Rubiah and others giving their thumbs-up to Kampung Sambir Extension Scheme. – Photo by Roystein Emmor

    ASAJAYA (Mar 27): A village extension scheme worth RM52.1 million will be implemented in Kampung Sambir here from June this year to June 2023, said Chief Minister Datuk Patinggi Abang Johari Tun Openg.

    The chief minister launched the Kampung Sambir Extension Scheme today, where he said the project was comprised of 269 units of houses, each of which was estimated at RM193,000.

    “We have proper planning for villages in Sarawak and through our village extension scheme, structured development is taking place in villages.

    “Soon our coastal areas will have modern housing and these modern village houses could be the most modern ones in the country,” he said at the launch of the village extension scheme covering 72.72 acres in Kampung Sambir here.

    For the freshest news, join Borneo Post Online’s Telegram Channel

    Abang Johari said the state government is subsidising the infrastructure costs for the extension scheme including concrete drains, access roads and street lighting.

    He said the Sarawak government had been able to increase the state’s revenue after recovering its oil and gas rights.

    “When we have more revenue, we give it back to our people. While we recover our oil and gas rights, I also have my own financing model to increase our revenue.”

    He said the state government would also carry on the coastal road project from Samarahan all the way up to the northern part of Sarawak.

    He was also pleased to remind all that the Batang Lupar Bridge project, which he recently performed ground-breaking for, would be the longest bridge in the country.

    He believed the longest bridge in Malaysia would be able to draw in tourists so as to give a boost to the tourism industry in the state.

    “Tourists will come and pose for a photo with the longest bridge in Malaysia. The Batang Lupar Bridge area will emerge as a tourism attraction,” he said.

    Abang Johari said the Sarawak government, under the Gabungan Parti Sarawak (GPS), would continue to bring about more development to the state.

    “Our people need to play their part to preserve unity, and choose us when the time comes,” he added.

    Earlier, Tourism, Arts and Culture Minister Datuk Abdul Karim Rahman Hamzah, who is Asajaya assemblyman, called upon villagers to apply for the scheme, which came with loan interest at one per cent.

    He said they could apply for a loan from Mutiara Mortgage and Credit Sdn Bhd.

    Abdul Karim also pledged a RM20,000 government grant for a local football team in Kampung Sambir.

    “I will also set aside some of the Rural Transformation Project (RTP) fund for the resurfacing of roads in Kampung Sambir,” he added.

    Among those present were federal Minister of Tourism, Arts and Culture Datuk Seri Nancy Shukri, Assistant Minister of Infrastructure and Ports Development Datuk Julaihi Narawi and Kota Samarahan MP Rubiah Wang.

    The post CM: Kampung Sambir village extension scheme worth RM52.1 mln to be implemented until June 2023 appeared first on Borneo Post Online.



    from Borneo Post Online https://ift.tt/2PaIRHy
    via IFTTT

    No comments:

    Post a Comment